configurations offered, with copies of the actual UL or FM test results.
1.6.4
Certify that materials and equipment furnished are identical to items that
have been in satisfactory use for at least two years prior to bid opening.
1.6.5
Test Procedures
Submit detailed test procedures for the fire alarm system 60 [_____]
calendar days prior to performing system tests.
1.7
DELIVERY, STORAGE AND HANDLING
Store and protect equipment from the weather, humidity and temperature
1.8
[EXISTING CONDITIONS
Existing system was manufactured by [_____], and new equipment shall be
compatible with and not reduce existing system operations and reliability.]
1.9
MAINTENANCE
1.9.1
Special Tools
Furnish a suitable testing instruments, metal tool box and special tools
required for the maintenance of the equipment to the Contracting Officer.
1.9.2
Spare Parts
**************************************************************************
NOTE: Delete equipment which is not applicable.
Letter-designate, in alphabetical order, items
required.
**************************************************************************
a.
Three sets of fuses of each type and size;
b.
Five spare lamps of each type;
c.
Two fire alarm box mechanisms;
d.
Two complete printed circuit modules for each recording device
e.
One suitable metal storage cabinet unless the fire alarm control
console is suitable;
f.
Five boxes of continuous feed printout paper;
g.
Two ink ribbons or cartridges for the printer; and
h.
One rectifier/charger at each location indicated.
1.9.3
Submit diagrams prior to final testing of the system.
SECTION 13851N
Page 13