3.2.3
Retesting
Rectify deficiencies indicated by test and completely retest work affected
by such deficiencies.
3.2.4
Fasteners
Nonremovable fasteners shall be installed after the system has been
thoroughly tested.
3.2.5
Inspection
Verify that units and controls are properly labeled, and interconnecting
wires and terminals identified. Contracting Officer will observe system
features specified.
3.3
INSTRUCTING GOVERNMENT PERSONNEL
Upon completion of the work and at a time designated by the Contracting
Officer, furnish a competent technician regularly employed or authorized by
the manufacturer of the duress system to instruct Government personnel in
the proper operation, maintenance, safety, and emergency procedures of the
watchtour system. The period of instruction shall be four eight-hour
working days. Conduct training at the job site.
-- End of Section --
SECTION 13799
Page 10