3.1.1.4
Shut down, lock out, and isolate HVAC systems that supply, exhaust, or pass
through the lead control areas. Seal intake and exhaust vents in the lead
control area with 0.15 mm 6 mil plastic sheet and tape. Seal seams in HVAC
components that pass through the lead control area. [Provide temporary HVAC
system for areas in which HVAC has been shut down outside the lead control
area.]
3.1.1.5
Decontamination Shower Facility
Provide clean and contaminated change rooms and shower facilities in
accordance with this specification and 29 CFR 1926.62.
3.1.1.6
Eye Wash Station
Where eyes may be exposed to injurious corrosive materials, suitable
facilities for quick drenching or flushing of the eyes shall be provided
within the work area.
3.1.1.7
Mechanical Ventilation System
a. To the extent feasible, use local exhaust ventilation or other
collection systems, approved by the CP. Local exhaust ventilation
systems shall be evaluated and maintained in accordance with 29 CFR
1926.62.
b. Vent local exhaust outside the building and away from building
ventilation intakes or ensure system is connected to HEPA filters.
c. Use locally exhausted, power actuated tools or manual hand tools.
3.1.1.8
Personnel Protection
herein. Eating, smoking, or drinking or application of cosmetics is not
permitted in the lead control area. No one will be permitted in the lead
control area unless they have been appropriately trained and provided with
protective equipment.
3.2
ERECTION
3.2.1
Lead Control Area Requirements
**************************************************************************
NOTE: Choose the first paragraph if PWL or MCL will
be removed by means that will not create airborne,
dust containing lead (such as carefully unfastening
sheets containing lead from walls). Choose the
second paragraph if removal practice will create
airborne, dust containing lead (such as sanding,
sawing, grinding, thermal cutting or digging or
demolition activities). Select the control method
that will ensure efficiency and prevents lead from
escaping outside of the lead control area.
**************************************************************************
[ Establish a lead control area by completely establishing barriers and
SECTION 13282N
Page 17