1.2.9
Lead Permissible Exposure Limit (PEL)
Fifty micrograms per cubic meter of air as an 8 hour time weighted average
as determined by 29 CFR 1926.62. If an employee is exposed for more than
eight hours in a work day, the PEL shall be determined by the following
formula:
PEL (micrograms/cubic meter of air) = 400/No. hrs worked per day
1.2.10
Material Containing Lead/Paint with Lead (MCL/PWL)
Any material, including paint, which contains lead as determined by the
testing laboratory using a valid test method. The requirements of this
section does not apply if no detectable levels of lead are found using a
quantitative method for analyzing paint or MCL using laboratory instruments
with specified limits of detection (usually 0.01%). An X-Ray Fluorescence
(XRF) instrument is not considered a valid test method.
1.2.11
Personal Sampling
Sampling of airborne lead concentrations within the breathing zone of an
employee to determine the 8 hour time weighted average concentration in
accordance with 29 CFR 1926.62. Samples shall be representative of the
employees' work tasks. Breathing zone shall be considered an area within a
hemisphere, forward of the shoulders, with a radius of 150 to 225 mm 6 to 9
inches and centered at the nose or mouth of an employee.
1.2.12
Physical Boundary
Area physically roped or partitioned off around lead control area to limit
unauthorized entry of personnel.
1.3
DESCRIPTION
1.3.1
Description of Work
**************************************************************************
NOTE: Specify the construction activities that will
impact lead based paint or lead containing material.
Show the location of MCL/PWL impacted construction
activities on the contract drawings and indicate its
condition (well adhered sheets or wrappings, solid,
aggregates, bricks or blocks, powdered, liquid,
sludge, etc.). Example activities include: preparing
surfaces for painting, saw cutting through painted
material, sanding painted surfaces, scabbling
painted or otherwise leaded concrete surfaces, blast
cleaning painted surfaces, torch cutting through
painted metal.
**************************************************************************
Construction activities impacting PWL or material containing lead which are
covered by this specification include the demolition and/or removal of
material containing lead in [_____] condition, located [_____] and as
indicated on the drawings. [________]
1.3.2
Coordination with Other Work
The contractor shall coordinate with work being performed in adjacent
SECTION 13282N
Page 7