SD-06 Test Reports
Factory Color Finish
Insulation
SD-07 Certificates
Preengineered metal building materials
Submit certificates attesting that materials comply with this
specification.
SD-10 Operation and Maintenance Data
Preengineered Building, data package 1; G, [_____]
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
1.4
QUALITY ASSURANCE
1.4.1
Qualifications
Qualifications of the manufacturer, the manufacturer's Representative when
one is used, and qualifications and experience of the building erector. A
brief list of locations where buildings of similar design have been used
information regarding date of completion, name and address of owner, and
how the structure is used.
1.4.1.1
Manufacturer
The manufacturer shall have AISC FCD, category MB certification.
1.4.1.2
Installer
**************************************************************************
NOTE: Obtain a waiver for this paragraph from the
Contracting Officer.
**************************************************************************
Erector shall have specialized experience in the erection of metal building
systems for a period of at least 3 years.
1.4.1.3
Manufacturer's Representative
**************************************************************************
NOTE: Remove this paragraph when the manufacturer's
representative is not required.
**************************************************************************
A representative designated by the building manufacturer, who is familiar
with the design of the building supplied and experienced in the erection of
metal buildings similar in size to the one required under this contract,
shall be present at the job site during construction, from the start of the
structural framing erection until completion of the installation of the
exterior covering, to assure that the building is erected properly.