provided by the crane manufacturer as specified in [Section 14630 OVERHEAD
ELECTRIC CRANES][_____]. Cranes with a capacity greater than 89 kN 10 tons
shall [be supported by a structural system which is separate from the
building frames except for lateral support. Flexible connections to the
building columns, if used, shall allow the separate crane support system to
resist longitudinal crane loads by other means without over stressing the
building frame. Likewise, the building frame shall be free to deflect
without over stress caused by connections to the more rigid crane support
system] [_____].
1.2.2.14
Section [13100N][13100A] LIGHTNING PROTECTION SYSTEM.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SECTION 13120