etc., consult the Contract Division Director and the
head of the Comptroller Department for assistance.
**************************************************************************
During the warranty testing and at a time designated by the Contracting
Officer, make available the services of a technician regularly employed or
authorized by the manufacturer of the Cathodic Protection System for
instructing Government personnel in the proper operation, maintenance,
safety, and emergency procedures of the Cathodic Protection System. Period
of instruction shall be not less than [one] [_____] but not more than [two]
[_____] 8-hour working day[s]. Conduct the training at the jobsite or at
another location mutually satisfactory to the Government and the Contractor.
The field instructions shall cover all of the items contained in the
operation and maintenance manual.
3.7
SCHEDULE
Some metric measurements in this section is based on a mathematical
conversion of an English unit measurement, and not on metric measurement
commonly agreed upon by the manufacturers or other parties. The English
and metric units for the measurements shown are as follows:
Product
English Units
Metric Units
a.
Ground rod
- Diameter
5/8 inch
15.89 mm
- Length
8 feet
2440 mm
b.
Porcelain spool
- Diameter
2 1/4 inch
57.15 mm
- Height
2 1/8 inch
53.97 mm
c.
Pin Insulator Assemblies
- Bolt diameter
1/4 inch
6.35 mm
- Bolt length
3/4 inch
19 mm
- Length of assembly
4 inches
100 mm
- Insulator hole
diameter
1/2 inches
13 mm
-- End of Section --
SECTION 13112N
Page 24