Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
**************************************************************************
NOTE: Typical installation of frames and HEMP
shielded door(s) shall be based in accordance with
manufacturer's installation drawings.
**************************************************************************
HEMP shielded door installation; G
Electric connectivity; G
Installation details; G
SD-03 Product Data
Shielded door and frame; G
Hardware and accessories; G
Hinges; G
Panic hardware; G
SD-06 Test Reports
Swinging door static load test; G
Swinging door sag test; G
Door closure test; G
Handle pull test; G
Electromagnetic SA test; G
Electromagnet (EM) shielded door tests; G
SECTION 13095N