without filtering. If fiber optic cable is used,
describe the penetration of the shield in detail.
For a discussion of the advantages and disadvantages
of fiber optic systems see NAVFAC DM-12.02.
Designer should consult these documents and other
appropriate sources before applying this guide
specification to large scale EMI enclosures to HEMP
and to TEMPEST Projects. The potential requirement
for thermal expansion joints inherent to large scale
enclosures is not addressed in this guide
specification. The extent and location of the work
to be accomplished and wiring, equipment, and
accessories necessary for a complete installation
**************************************************************************
**************************************************************************
NOTE: The following information shall be shown on
1.
Assembly details;
2.
Penetration details;
3. Location and method of mounting shielded
enclosure within building;
4. Location of mechanical and electrical equipment
within shielded enclosure;
5.
Interior wall finish;
6.
Suspended ceiling; and
7. Raised computer floor.
**************************************************************************
PART 1
GENERAL
1.1
REFERENCES
**************************************************************************
NOTE: Issue (date) of references included in
provided by the latest guide specification. Use of
SpecsIntact automated reference checking is
recommended for projects based on older guide
specifications.
**************************************************************************
The publications listed below form a part of this specification to the
extent referenced. The publications are referred to within the text by the
basic designation only.
AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL(AMCA)
AMCA 210
(1999) Laboratory Methods of Testing Fans
for Aerodynamic Performance Rating
SECTION 13094N
Page 4