continuous, without opening.
3.1.4
Welding Field Joints
Weld stainless steel by the electric fusion method.
Provide where required
by and in accord with paragraph "FABRICATION."
3.1.5
Brazing
Accomplish with silver solder. Use for joining copper tubing to brass and
bronze connection fitting and for no other purpose.
3.1.6
Cleaning and Adjusting
Test and adjust equipment for proper operation. Test rotating components
and motors for proper rotation. Lubricate moving parts if suggested by
manufacturer's literature. Prior to acceptance of project, clean and
sanitize equipment both inside and outside.
3.1.7
Installation of Hoods
Install in accord with NFPA 96. Install hoods to remain free from
vibration under all conditions of operation.
3.1.8
Floor Screeds
Anchor, install, and seal in accord with the recommendations of the
manufacturer of the walk-in unit.
3.2
FIELD INSPECTIONS AND TESTS
3.2.1
Inspections
Inspect equipment, fixtures, and material after installation for compliance
with the applicable standards.
3.2.2
Tests
equipment to determine that equipment and components, including controls,
safety devices, and attachments, operate as specified and are properly
installed and adjusted. Test all water, drain, gas, steam, oil,
refrigerant, and liquid carrying components for leaks. Notify the
Contracting Officer 14 calendar days prior to testing.
3.2.2.1
Walk-In [Refrigerator] [and] [Freezer] Test[s]
**************************************************************************
NOTE: This is an operational test for
freezer/cooler equipment only. Include only when
item specified to assure proper rotation of rotating
components, to preclude leakage or excessive noise
or vibration of components or parts due to poor
workmanship or improper design, to assure proper
electrical connection of electrical components, and
to assure the equipment will operate without failure
**************************************************************************
SECTION 11400N
Page 36