numbers, descriptive information, location, sizes, finish, key control
symbols including keying systems for each piece. Use the same door marks
as shown on the schedule in the contract documents.
1.4
DELIVERY, STORAGE, AND HANDLING
1.4.1
Keys
Send to the Contracting Officer directly from the manufacturer via
1.4.2
Detention Hardware
Deliver in a timely manner and store in accordance with the manufacturer's
recommendations. Deliver in manufacturer's original container and protect
from damage by weather.
1.5
HARDWARE COORDINATION CONFERENCE
Conduct a hardware coordination conference for hardware and hollow metal
work prior to submittals for the purpose of coordinating the interface of
materials that are furnished by the participants listed. Require that a
representative of the entity responsible for each of the following
functions attend the conference. Notify participants a minimum of 5
working days before the conference.
a.
Contractor
b.
Hollow metal supplier and installer
c.
Detention hollow metal supplier and installer
d.
Hardware supplier
e.
Hardware installer
f.
Detention hardware supplier
g.
Detention hardware installer
h.
i.
Electrical contractor
j.
Contracting Officer
1.6
MAINTENANCE TOOLS
Furnish six tool holders and bits for each different size and type of screw
and fastener.
1.7
TEMPLATES
Furnish templates for door and frame preparation.