Qualifications of Certified Industrial Hygienist (CIH); G, [_____]
Qualifications of Testing Laboratory for Coatings; G, [_____]
Qualifications of Testing Laboratory for Abrasive; G, [_____]
Qualifications of Coating Contractors; G, [_____]
[
Qualifications of Coating Manufacturer's Representative; G, [_____]
]
Roof Joint Sealant Materials; G, [_____]
Roof Joint Sealant Compatibility; G, [_____]
Epoxy Coating Materials; G, [_____]
Non-metallic Abrasive; G, [_____]
Metallic Abrasive; G, [_____]
SD-08 Manufacturer's Instructions
Roof Joint Sealant Instructions; G, [_____]
Coating System Instructions; G, [_____]
SD-11 Closeout Submittals
Disposal of Used Abrasive; G, [_____]
Inspection Logbook; G, [_____]
1.4
QUALITY ASSURANCE
1.4.1
Design Data
1.4.1.1
Environmental Control System
include ventilation, humidity control, and temperature regulation. Provide
calculations for humidity control during separate surface preparation and
coating application procedures, ventilation requirements during coating
application, and maximum allowable coating application rates to coincide
with ventilation. Include basis of design data on local conditions.
Provide equipment layout sketches and procedures showing function of each
piece of equipment and fail-safe measures. A Certified Industrial
Hygienist shall approve calculations, work procedures and personal
protective equipment.
1.4.1.2
Use of Door Sheet Access Way
If use of a door sheet access way is desired, submit design drawings and
calculations that address all aspects of the door sheet opening in
accordance with API Std 653 and API Std 650, including cutting of door
sheet, tank stabilization, door sheet replacement, weld testing, and final
acceptance. A registered engineer shall approve all calculations and
procedures.
SECTION 09973