Employer (if other than the Contractor)
Name of facility owner
Mailing address, telephone number, and telex number (if non-US) of
facility owner
Name of individual in facility owner's organization who can be
contacted as a reference
Location, size and description of structure
Dates work was carried out
Description of work carried out on structure
]
**************************************************************************
NOTE: For projects in continental US, Hawaii,
Alaska, and Puerto Rico, require SSPC Certification.
Use in other locations where qualified US
contractor is desired. If project involves removal
of paint containing hazardous materials, add
requirement for SSPC QP-2 certification in section
of specification where the hazardous paint removal
is specified, generally UFGS 13282N or UFGS 13283N.
**************************************************************************
**************************************************************************
NOTE: **WARNING**WARNING**WARNING**WARNING**
Solicitations requiring SSPC Certification should
point out the existence and location of the
certification requirement, in the Project
Information Form. To be enforceable, the
requirement must be pointed out in the solicitation
documents. SSPC Certification is a special
responsibility requirement pursuant to FAR 9.104-2.
This is analogous to requiring bidders to have a
specified level of experience or expertise and GAO
has sustained these types of special requirements.
**************************************************************************
**************************************************************************
NOTE: Use bracket option below concerning SSPC QP 1
only when industrial coatings are required.
Painting qualifications for projects such as BEQ's,
buildings do not require QP 1 certification.
**************************************************************************
[1.3.2
SSPC QP 1 Certification
All contractors and subcontractors that perform surface preparation or
coating application shall be certified by the Society for Protective
Coatings (formerly Steel Structures Painting Council) (SSPC) to the
requirements of SSPC QP 1 prior to contract award, and shall remain
certified while accomplishing any surface preparation or coating
application. The painting contractors and painting subcontractors must
remain so certified for the duration of the project. If a contractor's or
subcontractor's certification expires, the firm will not be allowed to