installation is complete, the fabric and acoustical wallcovering shall be
vacuumed with a ceiling to floor motion. Upon completion of presentation
dry erase wallcovering installation, clean the wallcovering surface as
recommended by the manufacturer prior to first use. When frame and tray are
required for presenation dry erase wallcovering they shall be installed in
3.3.2.1
Presenation Dry Erase Wallcovering Placement
**************************************************************************
NOTE: Delete frame size column in schedule when
wall-to-wall and floor-to-ceiling wallcovering is
specified.
Location of wallcovering and mounting height of
framed wallcovering must be specified.
Size and type of wallcovering should be specified
only once in the contract documents. If more than
one type is specified, clearly identify locations.
Installing horizontally eliminates seams at writing
height when installed at the proper height.
**************************************************************************
Presentation dry erase wallcovering shall be installed [wall-to-wall and
floor-to-ceiling][_____] and be installed horizontally on the wall. First
seam shall occur at [610 mm24 inches above finished floor for rooms with
2440 mm8 foot ceilings][ and][760 mm30 inches above finished floor for
rooms with 2740 mm9 foot ceilings][_____]. There shall be no seams at
writing height; a continual, seamless writing surface shall be provided.
[Wallcovering shall have an [aluminum][oak][_____]frame. Mounting height
of framed wallcovering shall be [as shown on the drawings][[_____] above
finished floor to top of the frame.]] Wallcovering locations shall be [as
indicated on drawings.][as scheduled below:
Room Name
Wall
Frame
and Number
Location
Size
[_____]
[_____]
[_____]]
3.3.3
Corner Guards and Wainscot Cap
Corner guards and wainscot cap shall be installed [where shown on the
drawings] [on all exposed corners with [wallcovering] [_____]] and in
accordance with the manufacturer's printed instructions. Corner guards
shall run from top of base to [wainscot cap] [ceiling] [_____] in a
continuous length.
3.4
CLEAN-UP
Upon completion of the work, wallcovering shall be left clean and free of
dirt, soiling, stain, or residual film. Surplus materials, rubbish, and
debris resulting from the wallcovering installation shall be removed and
area shall be left clean.
-- End of Section --
SECTION 09720
Page 15