Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Hardware schedule; G, [_____]
Keying system
SD-03 Product Data
Hardware items; G, [_____]
**************************************************************************
NOTE: For special hardware items requiring shop
drawings, add submittal requirement for SD-04,
Drawings. Do not require shop drawings for standard
commercial hardware.
**************************************************************************
SD-08 Manufacturer's Instructions
Installation
SD-10 Operation and Maintenance Data
Hardware Schedule items, Data Package 1; G, [_____]
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
SD-11 Closeout Submittals
Key bitting
1.3
HARDWARE SCHEDULE
Prepare and submit hardware schedule in the following form:
Reference
Mfr.
UL Mark
Publi-
Name
Key
(If fire
BHMA
Hard-
cation
and
Con-
rated
Finish
ware
Quan-
Type
Catalog
trol
and
Designa-
Item
tity Size No.
Finish
No.
Symbols
listed)
tion
----- ----- ---- ------ ------
-------
-------
--------
---------
1.4
KEY BITTING CHART REQUIREMENTS
Submit key bitting charts to the Contracting Officer prior to completion of
the work. Include:
a.
Complete listing of all keys (AA1, AA2, etc.).
b.
Complete listing of all key cuts (AA1-123456, AA2-123458).
SECTION 08710
Page 6