a.
Drawings and specifications and submittals related to the roof
work;
b.
Roof system components installation;
c.
Procedure for the roof manufacturer's technical representative's
onsite inspection and acceptance of the roofing substrate, the
name of the manufacturer's technical representatives, the
frequency of the onsite visits, distribution of copies of the
inspection reports from the manufacturer's technical
representative;
d.
Contractor's plan for coordination of the work of the various
trades involved in providing the roofing system and other
components secured to the roofing; and
e.
Quality control plan for the roof system installation;
f.
Safety requirements.
Preroofing conference scheduling shall be coordinated with the Contracting
Officer. The conference shall be attended by the Contractor, the
Contracting Officer's designated personnel, personnel directly responsible
for the installation of metal roof system, flashing and sheet metal work,
[[mechanical] [and] [electrical] work], other trades interfacing with the
roof work, and representative of the metal roofing manufacturer. Before
beginning roofing work, provide a copy of meeting notes and action items to
all attending parties. Note action items requiring resolution prior to
start of roof work.
1.5
DELIVERY, STORAGE, AND HANDLING
Deliver, store, and handle panel materials, bulk roofing products,
accessories, and other manufactured items in a manner to prevent damage and
deformation, as recommended by the manufacturer, and as specified.
1.5.1
Delivery
Deliver materials to the site in undamaged condition. Provide adequate
packaging to protect materials during shipment. Crated materials shall not
be uncrated until ready for use, except for inspection. Immediately upon
arrival of materials at jobsite, inspect materials for damage, deformation,
dampness, and staining. Remove affected materials from the site. Remove
moisture from wet materials not otherwise affected, restack and protect
from further moisture exposure.
1.5.2
Storage
Stack materials stored on site on platforms or pallets, and cover with
tarpaulins or other weathertight covering which prevents trapping of water
or condensation under the covering. Store roof panels so that water which
may have accumulated during transit or storage will drain off. Do not
store panels in contact with materials that might cause staining. Secure
coverings and stored items to protect from wind displacement.
1.5.3
Handling
Handle materials in a manner to avoid damage. Select and operate material
SECTION 07412
Page 12