compliance with the appropriate specification referenced herein.
Do not place materials without prior approval from the Contracting
Officer.
Grout Fluidifier
Aggregate
**************************************************************************
NOTE: Use this submittal on small repair projects,
not requiring injection grouting of cracks, whose
total surface area to be repaired does not exceed 2
square meters 20 square feet.
**************************************************************************
Epoxy Resin Binder
Epoxy Grout
[Epoxy-Coated Steel Bars
Written certification for coating material and coated bars shall
be submitted with the delivery of the bars.]
SD-08 Manufacturer's Instructions
Polymer-Modified Mortar
Polymer-Modified Concrete
Polymer Modifier
Epoxy Concrete
Epoxy Mortar
Epoxy Grout
Epoxy Injection Adhesive
Rapid-Hardening Repair Material
Polyurethane Injection Adhesive
High Molecular Weight Methacrylate (HMWM) Sealer
Submit manufacturer's written mixing, application and curing
instructions for each type of material.
1.6
QUALITY ASSURANCE
1.6.1
Qualifications
Submit Contractor qualifications and worker qualifications for approval in
accordance with paragraph SUBMITTALS. The submittals shall, where
applicable, identify individuals who will be working on this contract and
their relevant experience. Do not make changes in approved personnel
without prior approval of the Contracting Officer.
1.6.1.1
Contractor Qualifications
The Contractor performing the repair work shall have been involved in a
minimum of [three] [ ] concrete repair projects similar in size and scope
to this project for at least [five] [ ] years.
SECTION 03931
Page 28