undisturbed, coordination with other work in progress, and timely
disconnection of utility services. The procedures shall include a
detailed description of the methods and equipment to be used for
each operation, and the sequence of operations in accordance with
EM 385-1-1. Where applicable, the plan shall include drilling
patterns and means of controlling crack propagation. The work
plan shall also include an access plan for personnel; [a Lead
Protection Plan]; and method of controlling, collecting, and
removing debris.
Blasting Plan[; G][; G, [_____]]
Submit a detailed plan for blasting, safety, and traffic
controls for approval at least [30][60] days prior to performance
of any blasting. Submit a detailed blasting plan for each
individual blast for approval at least 24 hours prior to drilling
for the blast. The blasting plan shall state location, number of
holes, size, depth, spacing, loading of individual holes, type of
explosives, time delay sequences, and seismographic monitoring to
performed. The plan shall also address coordination with highway,
railroad and river traffic, project personnel and the public as
applicable.
Water Control Plan[; G][; G, [_____]]
Submit a detailed plan for collection, treatment and disposal of
wastewater from drilling, sawing and other concrete removal
operations at least [30][60] days prior to performance of any
operations that produce wastewater. The plan shall include copies
of required permits or other evidence of compliance with
applicable Federal, State and local laws and regulations.
Erection Plan for Precast Units
Submit a detailed erection plan at least [30][60] days prior to
the date that erection of precast units is to begin. This plan
shall be in sufficient detail so that adequacy of equipment,
techniques and accessories can be determined and comments offered.
The plan shall include design calculations for loading and
deflection on the precast units. Acceptance of the Contractor's
erection plan shall not relieve the contractor of his
responsibility for erecting the precast units into position as
required by the contract drawings, and these specifications. The
plan shall include the procedure of placing the infill concrete,
including the positioning of hoppers and chutes, and all forming
techniques to be employed.
Alignment Plan for Precast Units
Submit a detailed plan for aligning precast units to the
alignment and profile indicated on the contract drawings.
Identify all safety and quality control aspects for performing
this alignment operation. Submit with the erection plan.
Contractor Qualifications
Worker Qualifications
Blasting Personnel Qualifications
Submit Information, including name, dollar value, date, and