show that proportions thus selected will produce concrete of the
qualities indicated. No substitution shall be made in the source
or type of materials used in the work without additional tests to
show that the quality of the new materials and concrete are
satisfactory.
Batch Plant[; G][; G, [_____]]
The Contractor shall submit batch plant data to the Contracting
Officer for review for conformance with applicable specifications.
Concrete Mixers
Capacity
The Contractor shall submit concrete mixer data which includes
the make, type, and capacity of concrete mixers proposed for
mixing concrete.
Conveying Equipment
Data on the conveying equipment and methods for transporting,
handling, and depositing the concrete.
Placing Equipment
Data on placing equipment and methods.
Tests and Inspections
Testing Technicians
Concrete Transportation Construction Inspector (CTCI)
Concrete Construction Inspector (CCI)
concrete inspectors meet the specified requirements.
Construction Joint Treatment[; G][; G, [_____]]
The method and equipment proposed for joint cleanup and waste
disposal shall be submitted for review and approval.
Curing and Protection[; G][; G, [_____]]
The curing medium and methods to be used shall be submitted for
review and approval.
Cold-Weather Placing[; G][; G, [_____]]
If concrete is to be placed under cold-weather conditions, the
proposed materials, methods, and protection shall be submitted for
approval.
Hot-Weather Placing[; G][; G, [_____]]
Finishing[; G][; G, [_____]]
If concrete is to be placed under hot-weather conditions, the
proposed materials and methods shall be submitted for review and
approval.
SD-04 Samples
SECTION 03301A
Page 12