Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Shop Drawings.
Scale drawings defining the revised use zone configuration.
Finished Grade and Underground Utilities
irrigation system status; and location of underground utilities
and facilities.
SD-03 Product Data
Synthetic Surfacing
Loose Fill Surfacing
Geotextile Fabric
Manufacturer's descriptive data; catalogue cuts; and the latest
edition of ASTM F 1487 and CPSC Pub No 325.
Manufacturer's specifications, handling and storage
requirements, installation procedures, and safety data sheets to
synthetic surfacing and loose fill surfacing.
A list to include part numbers of furnished protective surfacing
materials and components for synthetic surfacing and loose fill
surfacing
Delivery schedule and manufacturer name for synthetic surfacing
and loose fill surfacing plus delivery, storage and handling
information.
Impact attenuation and critical height performance for each
thickness of synthetic surfacing and loose fill surfacing provided.
Manufacturer's Qualification
Name of the owner or user; service or preventive maintenance
provider; date of the installation; point of contact and telephone
number; and address for 10 sites.
SECTION 02791
Page 8