Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Waybills and Delivery Tickets
Waybills and delivery tickets, during the progress of the work.
Before the final statement is allowed, certified waybills and
delivery tickets for all materials used in the work covered by
this section shall be filed.
Equipment List
List of equipment used in the project along with calibration
reports.
Inspection Reports
Reports of climatic temperature during application of fog seal,
emulsion temperature and rate.
SD-04 Samples
Bituminous Materials
Aggregates
From each source of supply, a 4 L one gallon sample of
bituminous material and a 23 kg 50 pound sample of aggregate for
each aggregate size.
Fog Seal[; G][; G, [_____]]
Submit in accordance with paragraph titled "Sample Application",
for approval and selection of one of the trial application rates.
SD-06 Test Reports
Tests
Copies of the test results, within 24 hours of the completion of
the test. Certified copies of the aggregate test results, not
less than [30] [_____] days before the material is required in the
work. Certified copies of the bituminous materials test reports
indicating compliance with applicable specified requirements, not
less than [30] [_____] days before the material is required in the
work. A copy of the calibration test results, before the
bituminous distributor and aggregate spreader are used on the job.