[, using a coefficient of expansion of 0.00045 per degree C 0.00025 per
1.2.2
Aggregate Measurement Methods
The amount of aggregate to be paid for will be measured in [metric tons tons
] [cubic meters cubic yards] of dry aggregate. Measurement of the
materials shall be by [approved weigh scales] [determining the volume
capacity of each vehicle delivering the material to the site of the work or
stockpiles].
1.3
PAYMENT
**************************************************************************
NOTE: Delete this paragraph when lump sum bidding
is used.
**************************************************************************
The quantities of aggregate and bituminous material, determined as
specified in paragraph MEASUREMENT FOR PAYMENT above, will be paid for at
the respective contract unit prices. Payment shall constitute full
compensation for all operations necessary to complete the work as specified
herein.
1.4
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.