1.2.1
Measurement
1.2.1.1
Surface Preparation
The unit of measurement for surface preparation will be the number of
square meters square feet of pavement surface prepared for marking and
accepted by the Contracting Officer.
1.2.1.2
Pavement Striping and Markings
The unit of measurement for pavement striping and markings will be the
number of square meters square feet of reflective and nonreflective
striping or marking actually completed and accepted by the Contracting
Officer.
1.2.1.3
Raised Pavement Markers
The unit of measurement for raised pavement markers will be the number of
square meters square feet of each specific color required. Payment will be
for the total number actually placed and approved by the Contracting
Officer.
1.2.1.4
Removal of Pavement Markings
The unit of measurement for removal of pavement markings shall be the
number of square meters square feet of pavement markings actually removed
and accepted by the Contracting Officer.
1.2.2
Payment
The quantities of surface preparation, pavement striping or markings,
raised pavement markers, and removal of pavement markings determined as
specified in paragraph Measurement, will be paid for at the contract unit
price. The payment will constitute full compensation for furnishing all
labor, materials, tools, equipment, appliances, and doing all work involved
in marking pavements. Any striping or markings which are placed without
reflective media, when reflective media is required, shall be removed and
replaced at no cost to the Government. Striping or markings which do not
conform to the alignment and/or location required shall be removed and
replaced at no cost to the Government.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
SECTION 02763A
Page 5