A copy of qualified jointing procedures, training procedures,
qualifications of trainer, and training test results for joiners
and inspectors.
Connection and Abandonment Plan[; G][; G, [_____]]
A copy of procedures for gas line tie in, hot taps,
abandonment/removal or demolition, purging, and plugging as
applicable in accordance with ASME B31.8.
SD-06 Test Reports
Pressure and Leak Tests[; G][; G, [_____]]
Data from all pressure tests of the distribution system.
SD-07 Certificates
Utility Work
Certification from the Operating Agency/Utility Company that
work for which the Utility is responsible has been completed.
Training
A copy of each inspector's and jointer's training certificate
with respective test results.
SD-10 Operation and Maintenance Data
Gas Distribution System
[Six] [_____] copies, in booklet form and indexed, of site
specific natural gas operation and maintenance manual for each gas
distribution system including system operation, system
maintenance, equipment operation, and equipment maintenance
provided in a common volume, they shall be clearly differentiated
and separately indexed.
The System Operation Manual shall include but not be limited to
the following:
a. Maps showing piping layout and locations of all system
valves and gas line markers.
b. Step-by-step procedures required for system startup,
operation, and shutdown. System components and equipment shall be
indexed to the gas maps.
c. Isolation procedures and valve operations to shut down or
isolate each section of the system. Valves and other system
components shall be indexed to the gas maps.
d. Descriptions of Site Specific Standard Operation
Procedures including permanent and temporary pipe repair
procedures, system restart and test procedures for placing
repaired lines back in service, and procedures for abandoning gas
piping and system components.
SECTION 02556A
Page 8