Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Pipe, Fittings, and Associated Materials
Drawings shall contain complete schematic and piping diagrams
and any other details required to demonstrate that the system has
been coordinated and will properly function as a unit. Drawings
shall show proposed layout and anchorage of the system and
appurtenances, and equipment relationship to other parts of the
work including clearances for maintenance and operation.
SD-03 Product Data
Materials and Equipment
A complete list of equipment and materials, including
manufacturer's descriptive and technical literature, performance
including, but not limited to the following:
a.
Dielectric Waterways and Flange Kits.
b.
Meters.
c.
d.
Regulators.
e.
[Earthquake Actuated Automatic Gas Shutoff System]
f.
Emergency Gas Supply Connection.
Spare Parts
Spare parts lists for each different item of material and
equipment specified.
Connections to Existing Lines
Notification of the Contractor's schedule for making connections
to existing gas lines, at least 10 days in advance.
Welding Steel Piping
A copy of qualified welding procedures along with a list of
and welding operators.
Jointing Polyethylene and Fiberglass Piping[; G][; G, [_____]]