Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Existing Conditions
Drawings of existing conditions, as specified.
SD-02 Shop Drawings
Drawings
Installation and As-Built drawings, as specified.
Precast concrete manhole
Metal items
Frames, covers, and gratings
Details, as specified.
SD-03 Product Data
Pipeline materials
Submit manufacturer's standard drawings or catalog cuts.
SD-06 Test Reports
Reports
Test and inspection reports, as specified.
SD-07 Certificates
Portland Cement
Certificates of compliance stating the type of cement used in
Gaskets
SECTION 02531
Page 15