ASTM D 5088
Used at Nonradioactive Waste Sites
ASTM D 5092
(2004e1) Design and Installation of Ground
Water Monitoring Wells in Aquifers
ASTM F 480
(2002) Thermoplastic Well Casing Pipe and
Ratios (SDR), SCH 40 and SCH 80
ASTM F 883
(2004) Padlocks
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1
(2003) Safety -- Safety and Health
Requirements
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 530/F-93/004
(1993; Rev O; Updates I, II, IIA, IIB, and
Waste (Vol IA, IB, IC, and II) (SW-846)
EPA 600-4-89-034
(1990) Handbook of Suggested Practices for
Monitoring Wells
EPA 600/4-79/020
Water and Wastes
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910
Occupational Safety and Health Standards
1.2
DESCRIPTION OF WORK
Provide [extraction] [monitoring] well[s] including drilling, casing, well
screen, gravel packing, grouting, development, monitoring device, and
incidental related work complete and ready for operation.
1.3
GENERAL REQUIREMENTS
Each system, including equipment, materials, installation, and performance,
shall be in accordance with local, State, and Federal regulations, ASTM D
5092, and EPA 600-4-89-034 except as modified herein. Consider the
advisory or recommended provisions to be mandatory, as though the word
"shall" has been substituted for the word "should" wherever it appears.
Reference to the "Project Representative" and the "Owner" shall be
interpreted to mean the Contracting Officer. Additional requirements are
included under Section 01500N TEMPORARY FACILITIES AND CONTROLS. Mark and
secure monitoring well[s] to avoid unauthorized access and tampering.
1.4
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
SECTION 02525N
Page 5