1.2.7.1
Payment
Payment will be made for costs associated with furnishing and installing
[Soil] [Rock] Anchors, Complete which are accepted. The price shall
include installation of anchors and proof testing as specified. No payment
will be made for anchors which do not meet the acceptance criteria, except
when failure is due to lower than assumed [soil-][rock-]grout bond strength
or other information furnished by the Government.
1.2.7.2
Measurement
[Soil] [Rock] Anchors, Complete will be measured based upon the number of
anchors installed and accepted in accordance with the specifications.
1.2.7.3
Unit of Measure
Unit of measure:
each.
1.2.8
Watertightness Testing
**************************************************************************
NOTE: This payment item will be deleted when
watertightness testing is not required.
**************************************************************************
1.2.8.1
Payment
Payment will be made for costs associated with Watertightness Testing.
1.2.8.2
Measurement
Watertightness Testing will be measured for payment based upon the number
of watertightness tests actually performed at the direction of the
Contracting Officer and in accordance with the specifications or as
otherwise required.
1.2.8.3
Unit of Measure
Unit of measure:
each.
1.2.9
Pregrouting Holes
**************************************************************************
NOTE: This payment item will be deleted when
watertightness testing is not required.
**************************************************************************
1.2.9.1
Payment
Payment will be made for costs associated with Pregrouting Holes [which
fail] [prior to] watertightness testing.
1.2.9.2
Measurement
Pregrouting Holes will be measured for payment based upon the number of
94-pound bags of cement that were actually injected into the anchor hole as
specified.
SECTION 02490
Page 12