and found to be damaged to such extent as to impair its usefulness in the
completed structure shall be removed from the work and the Contractor shall
furnish and drive a new pile to replace the damaged pile. Piles pulled and
found to be sound and in a satisfactory condition shall be redriven.]
3.2.1.2
All on site application of wood preservatives must be performed by a person
certified through an EPA approved training program for the application of
wood treatment products in accordance with 40 CFR 171, regulated under 7
U.S.C.A. Sections 136 to 136y, Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA). On site treatment shall also be in accordance
with AWPA M4, Sections 1.5, 2.2, 2.3, and 3.1.
3.3
FIELD QUALITY CONTROL
3.3.1
Inspections
When Government inspections result in product rejection, the Contractor
shall promptly segregate and remove rejected material from the premises.
The Government may also charge the Contractor an additional cost of
inspection or test when prior rejection makes reinspection or retest
necessary.
-- End of Section --
SECTION 02461
Page 26