redriven to the required tip elevation. Remove and replace with new piles
those damaged, mislocated, or driven out of alignment or provide additional
piles, driven as directed.
3.8
RECORDS
Keep a complete and accurate record of each pile driven. Indicate the pile
location, butt diameter, original length, ground elevation, tip elevation,
cutoff elevation, penetration in blows per meter foot for the entire length
of penetration for test piles, penetration in blows per meter foot for the
last 3 m 10 feet for job piles, hammer data including make and size, and
any unusual pile behavior or circumstances experienced during driving such
as redriving, heaving, weaving, obstructions, jetting, spudding, and
unanticipated interruptions which may occur. The following log is a
preprinted form for recording pile driving data.