PILE DRIVING LOG
54
_____
77
_____
99
_____
55
_____
78
_____
100
_____
56
_____
79
_____
101
_____
57
_____
80
_____
102
_____
58
_____
81
_____
103
_____
59
_____
82
_____
104
_____
60
_____
83
_____
105
_____
61
_____
84
_____
106
_____
62
_____
85
_____
107
_____
63
_____
86
_____
108
_____
64
_____
87
_____
109
_____
65
_____
88
_____
110
_____
66
_____
89
_____
111
_____
67
_____
90
_____
112
_____
68
_____
91
_____
113
_____
69
_____
92
_____
114
_____
70
_____
93
_____
115
_____
71
_____
94
_____
116
_____
72
_____
95
_____
117
_____
73
_____
96
_____
118
_____
74
_____
97
_____
119
_____
75
_____
98
_____
120
_____
76
_____
__________________________________________________________________________
DRIVING RESISTANCE IN BLOWS PER INCH FOR LAST FOOT OF PENETRATION:
DEPTH________
DEPTH________
1"___2"___3"___4"___5"___6"___7"___8"___9"___10"___11"___12"___
ELEV._______
ELEV.________
REMARKS___________________________________________________________________
__________________________________________________________________________
CUT OFF ELEVATION:
FROM DRAWING
________________
TIP ELEVATION = GROUND ELEVATION - DRIVEN DEPTH =
________________
DRIVEN LENGTH = CUT OFF ELEVATION - TIP ELEVATION =
________________
CUT OFF LENGTH = PILE LENGTH - DRIVEN LENGTH =
________________
SHEET 2 OF 2
-- End of Section --
SECTION 02458N
Page 19