[Ordered
Tip to
Butt
Tip
Pile Length
Cut-Off
Circum-
Circum-
ference
ference
(ft)
Length (ft)
Specified
Specified
___________
___________
____________
_________
20
19
-
-
25
24
-0.04
+0.05
30
29
-0.04
+0.05
35
34
-0.04
+0.05
40
39
-0.04
+0.05
45
44
-0.04
+0.05
50
49
-0.04
+0.05
55
54
+0.10
+0.05
60
59
+0.15
+0.05
65
64
+0.15
+0.10
70
69
+0.15
+0.15
75
74
+0.35
+0.35]
**************************************************************************
Increase in Length
Factor
[_____] meters
1.00
Over 0.0 to 1.5
meters,
inclusive
[_____]
Over 1.5 to 3.0
meters,
inclusive
[_____]
Over 3.0 to 4.5
meters,
inclusive
[_____]
Over 4.5 to 6.0
meters,
inclusive
[_____]
Over 6.0 to 7.5
meters,
inclusive
[_____]
Increase in Length
Factor
[_____] feet
1.00
Over 0.0 to 5.0 feet, inclusive
[_____]
Over 5.0 to 10.0 feet, inclusive
[_____]
Over 10.0 to 15.0 feet, inclusive
[_____]
Over 15.0 to 20.0 feet, inclusive
[_____]
Over 20.0 to 25.0 feet, inclusive
[_____]
When the Contracting Officer directs that a pile shall be cut off before
the tip has reached the specified depth of tip penetration, payment will be
made for that remaining length of pile not driven to the required minimum
depth at the rate of 80 percent of the basic contract unit price bid,
except when the Contractor is directed to order piles at a longer length
which will be paid for at 80 percent of he adjusted unit price. No other
payments for such cutoffs will be paid. Should the total tip to cutoff
length of piles underrun that specified by more than 25 percent, the unit
price per foot for such piles will be adjusted in accordance with "FAR
52.236-2, Differing Site Conditions." Any pile required to be pulled at no
fault of the Contractor will be paid for at the applicable contract unit
price for furnishing and driving the pile to the tip to cutoff length
specified, plus 50 percent of that amount to cover the cost of pulling.
Such pulled piles when redriven will be paid for at 50 percent of the
applicable contract unit price for the length driven. [Payment for each
complete test loading of a single pile will be made at the contract unit
price per test, which price shall include furnishing, placing, and removing
testing equipment, and placing and removing test loads. At the direction
of the Contracting Officer, load tests may be waived at a credit to the
Government of the unit price bid therefor.] Authorized splices will be
SECTION 02458N
Page 9