1.2.2.2
Preventive Maintenance Plan and Schedule
Include manufacturer's schedule for routine preventive maintenance,
inspections, tests and adjustments required to ensure proper and economical
projection of preventive maintenance work-hours on a daily, weekly,
monthly, and annual basis including craft requirements by type of craft.
For periodic calibrations, provide manufacturer's specified frequency and
procedures for each separate operation.
1.2.3
Corrective Maintenance (Repair)
Include manufacturer's recommended procedures and instructions for
correcting problems and making repairs.
1.2.3.1
Troubleshooting Guides and Diagnostic Techniques
Include step-by-step procedures to promptly isolate the cause of typical
malfunctions. Describe clearly why the checkout is performed and what
conditions are to be sought. Identify tests or inspections and test
equipment required to determine whether parts and equipment may be reused
or require replacement.
1.2.3.2
wiring and control circuits including factory-field interfaces. Provide a
complete and accurate depiction of the actual job specific wiring and
control work. On diagrams, number electrical and electronic wiring and
pneumatic control tubing and the terminals for each type, identically to
actual installation configuration and numbering.
1.2.3.3
Include instructions and alist of tools required to repair or restore the
product or equipment to proper condition or operating standards.
1.2.3.4
Removal and Replacement Instructions
Include step-by-step procedures and a list required tools and supplies for
removal, replacement, disassembly, and assembly of components, assemblies,
subassemblies, accessories, and attachments. Provide tolerances,
dimensions, settings and adjustments required. Instructions shall include
a combination of text and illustrations.
1.2.3.5
Spare Parts and Supply Lists
Include lists of
spare parts and supplies required for maintenance and
repair to ensure
continued service or operation without unreasonable
delays. Special
consideration is required for facilities at remote
locations. List
spare parts and supplies that have a long lead-time to
obtain.
1.2.4
Corrective Maintenance Work-Hours
Include manufacturer's projection of corrective maintenance work-hours
requires completion or participation of the equipment manufacturer shall be
identified and tabulated separately.