3.1.5.4
Target Contaminant and Operating Conditions
Target contamination concentrations prior to treatment shall be matched
with concentrations in treated material. These data shall be linked to
specific operating conditions.
3.1.5.5
Target Contaminant and Removal Efficiencies
Target contaminant concentrations prior to treatment shall be compared with
concentrations in treated material, to determine removal efficiencies and
average concentrations.
3.1.5.6
Characteristics of Treated Material
The physical and chemical state of the treated material shall be assessed
using methods appropriate for the material.
3.1.6
Performance Data Quality
The narrative shall provide an overall assessment of the quality control of
the available performance data. A brief description of the Quality
Assurance Project Plan (QAPP) for the remediation effort shall include how
checks were made on the sample analysis and interpretation, and a
discussion of the use of statistics in sampling program design and data
interpretation.
3.1.7
Treatment System Cost
The Contractor shall use the work breakdown structure specified in ER
1110-3-1301 to the third (subsystem) level, in conjunction with the
standard descriptions, to document costs for activities directly attributed
to the treatment system; however, utilizing lower levels for each work
breakdown structure is optional. The third (subsystem) level of detail
Documentation of costs for before treatment activities shall be identified
separately in the appropriate third-level remedial action work breakdown
structure categories, i.e. Monitoring, Sampling, Testing, and Analysis.
using the O&M work breakdown structure. The documentation shall identify
unit costs and number of units for each cost element, as specified in ER
1110-3-1301. Cost for activities directly attributed to the treatment
shall be shown as a total cost and as a calculated cost on a per unit of
media treated basis, and on a per unit of contaminant removed basis, as
indicated. The second (system) and the third (subsystem) level cost
elements for activities directly associated with the project are shown in
the same referenced documents.
3.1.7.1
HTRW - Remedial Action Work Breakdown Structure
The Contractor shall appropriately allocate invoices for materials, labor,
supplies, services, and other costs. These costs shall be allocated to
pretreatment, treatment, and post-treatment activities. These cost
allocations shall include the sub-breakdown of cost elements. Costs should
be further allocated between capital and operating costs.
3.1.7.2
Pre-Treatment Costs
The pre-treatment costs reported shall include preparation costs (i.e.
SECTION 01240A