Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Schedule of prices; G
1.3
SCHEDULE OF PRICES
1.3.1
Data Required
[This contract requires the use of a cost-loaded Network Analysis Schedule.
intregal part of the Network Analysis Schedule (NAS) and its Mathematical
Analysis.] [Within [15] [_____] calendar days of notice of award, prepare
and deliver to the Contracting Officer a schedule of prices (construction
contract) on the forms furnished by the Government.] Provide a detailed
breakdown of the contract price, giving quantities for each of the various
kinds of work, unit prices, and extended prices therefor.
[1.3.2
Construction Categories
**************************************************************************
NOTE: Include this paragraph for projects funded
under the military construction (MCON) programming
system and list construction category numbers and
descriptions. This information will be provided by
the Government.
**************************************************************************
The following construction categories apply to work covered by this
specification:
CATEGORY
DESCRIPTION
[_____]
[_____]
Divide detailed breakdown into each construction category, stated in this
contract. Subcontractors who may be involved in work under more than one
of these categories shall be advised of this requirement in order to
furnish such data without delay. Construction categories given above may
be modified by the Contracting Officer as necessary during course of work.
]1.3.3
Schedule Instructions
Payments will not be made until the [Schedule of Prices][cost-loaded NAS]
has been submitted to and accepted by the Contracting Officer. Identify
the cost for site work, and include incidental work to the 1.5 m 5 foot
line. Identify costs for the building(s), and include work out to the 1.5 m
5 foot line. Work out to the 1.5 m 5 foot line shall include construction
encompassed within a theoretical line 1.5 m 5 feet from the face of
exterior walls and shall include attendant construction, such as cooling
towers, placed beyond the 1.5 m 5 foot line.