Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Fiber Optic System; G
SD-03 Product Data
Fiber Optic Media Types; G
Fiber Optic Splices Material Data; G
Fiber Optic Terminations and Connectors Material Data; G
Fiber Optic Enclosures; G
SD-06 Test Reports
Fiber Optic Factory Test Plan; G
Fiber Optic Field Tests Plan; G
SD-07 Certificates
Fiber Optic Cable Installer and Splicer Qualifications; G
Manufacturer's qualifications; G
SD-08 Manufacturer's Instructions
Fiber optic system instructions; G
1.4
QUALITY ASSURANCE
1.4.1
Fiber Optic System
Provide drawings for the fiber optic cable and pathway system. Provide
single line schematic details of the fiber optic and pathway media,
Distribution Designer (RCDD) approved drawings of the fiber optic system.
Include drawing details of fiber optic terminations in equipment rooms.
System drawings shall show final configuration, including location, fiber
pair count, pathway innerduct arrangement, and pathway assignment of
SECTION 16713N
Page 7