in accordance with the transformer manufacturer's specifications.
a.
b.
Turns ratio test.
c.
[_____]
3.11.9
Pass-fail criteria shall be in accordance with the circuit breaker
manufacturer's specifications.
a.
Insulation resistance test phase-to-phase.
b.
c.
Closed breaker contact resistance test.
d.
Power factor test.
e.
High-potential test.
f.
[Manual] [and] [electrical] operation of the breaker.
3.11.10
**************************************************************************
NOTE: List specific breakers to be tested. Delete
entirely if test not required.
**************************************************************************
ANSI C37.50.
a.
[_____].
b.
[_____].
c.
[_____].
3.11.11
Protective Relays
Protective relays shall be visually and mechanically inspected, adjusted,
tested, and calibrated in accordance with the manufacturer's published
instructions. Tests shall include pick-up, timing, contact action,
restraint, and other aspects necessary to ensure proper calibration and
operation. Relay settings shall be implemented in accordance with the
coordination study. Relay contacts shall be manually or electrically
operated to verify that the proper breakers and alarms initiate. Relaying
current transformers shall be field tested in accordance with IEEE C57.13.
3.11.12
Pre-Energization Services
Calibration, testing, adjustment, and placing into service of the
installation shall be accomplished by a manufacturer's product field
service engineer or independent testing company with a minimum of 2 years
of current product experience. The following services shall be performed
SECTION 16375A
Page 65