[3.5.2
Field Dielectric Tests
**************************************************************************
NOTE: Field dielectric tests are recommended when
new units are added to an existing installation or
after major field modifications. If necessary,
service the equipment prior to the field test.
**************************************************************************
Perform field dielectric tests on medium-voltage switchgear according to
IEEE C37.20.2 or IEEE C37.20.3 as applicable.
]3.5.3
Follow-Up Verification
**************************************************************************
NOTE: Use "10" working days and include last
bracketed sentence in the paragraph for
SOUTHNAVFACENGCOM projects.
**************************************************************************
Upon completion of acceptance checks, settings, and tests, the Contractor
shall show by demonstration in service that circuits and devices are in
good operating condition and properly performing the intended function.
Test shall require each item to perform its function not less than three
times. As an exception to requirements stated elsewhere in the contract,
notify the Contracting Officer [5][10] working days in advance of the dates
and times for checks, settings, and tests[, to allow the Contracting
Officer to notify SOUTHNAVFACENGCOM Code 0742; Electrical Engineering
Division and Code 162; Director, Utilities Engineering Division].
-- End of Section --
SECTION 16361N
Page 49