duration, not later than [_____] months prior to the date of each
test.
Factory and field test reports in booklet form tabulating
factory and field tests and measurements performed, upon
completion and testing of the installed system. Factory and field
test reports shall be signed by an official authorized to certify
on behalf of the manufacturer of the UPS system that the system
meets specified requirements. The reports shall be dated after
the award of this contract, shall state the Contractor's name and
address, shall name the project and location, and shall list the
specific requirements which are being certified.
1.3
SYSTEM DESCRIPTION
**************************************************************************
NOTE: Delete system cabinet when specifying a
single module UPS system.
**************************************************************************
The UPS system shall consist of UPS module, battery system, battery
protective device, system cabinet, static bypass transfer switch, controls
and monitoring. Input ac power shall be connected to the normal source ac
input of the UPS module. The battery shall be connected to the dc input of
the UPS module through the battery protective device. The ac output of the
UPS system shall be connected to the critical loads.
1.3.1
UPS Module and Battery System
UPS module shall contain required input isolation transformer,
rectifier/charger unit, inverter unit and controls, battery protective
device, and any other specified equipment/devices. Battery system shall
contain the battery cells, racks, battery disconnect, battery monitor and
cabinet, if required.
1.3.2
Cabinet, Static Bypass Transfer Switch, Control and Monitoring
The UPS system shall include the system cabinet, static bypass transfer
isolating the system from the critical load, and remote monitoring
1.3.3
1.3.3.1
Parts and Materials
Parts and materials comprising the UPS system shall be new, of current
manufacture, of a high grade and free of defects and imperfections, and
shall not have been in prior service except as required during aging and
factory testing.
1.3.3.2
Components
Active electronic devices shall be solid state.
Semiconductor devices
shall be sealed. Relays shall be dust-tight.
1.3.3.3
Semiconductor Fusing
Power semiconductors shall be fused to prevent cascaded or sequential
SECTION 16265A