(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
UPS System
Installation
materials, manufacturer's descriptive and technical literature,
battery sizing calculations per IEEE Std 485, installation
instructions, single-line diagrams, ladder-type schematic
diagrams, elevations, layout drawings, and details required to
demonstrate that the system has been coordinated and will function
properly as a unit.
SD-03 Product Data
Performance Requirements
Pertinent performance data for the UPS system, using a copy of
the data sheets supplied with this specification. Data sheets
shall be certified by a responsible officer of the UPS
manufacturer.
Spare Parts
Spare parts data, as specified.
Field Training[; G][; G, [_____]]
Lesson plans and training manuals for the training phases,
including type of training to be provided and proposed dates, with
SD-06 Test Reports
Factory Testing
Field Supervision, Startup and Testing
A detailed description of proposed factory test and field test
procedures, including proposed dates and steps outlining each
test, how it is to be performed, what it accomplishes, and its
SECTION 16265A
Page 7