delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Motors[; G][; G, [_____]]
[Six] [_____] copies of equipment foundation dimensions; outline
drawings with weights, nameplate data, and details showing method
of mounting and anchoring the motor. Contracting Officer's
approval shall be obtained in writing prior to the commencement of
manufacture of motors.
SD-03 Product Data
Insulated Windings[; G][; G, [_____]]
A detailed description of and specification for the
manufacturing process, the materials and the insulating varnish or
compound used in insulating the windings shall be submitted to the
Contracting Officer for approval before manufacture of the motors
is commenced. If, in the opinion of the Contracting Officer, the
insulation proposed is not of the quality specified and if the
methods of manufacture are not considered to be in accordance with
best modern practice, the motors will not be accepted. [Six]
[_____] copies of motor design curves and [Six] [_____] copies of
motor speed-torque curves, as specified, shall be submitted.
Duty Cycle[; G][; G, [_____]]