1.9.5
Site Testing Procedures
Indicate test equipment to be used including manufacturers' names and model
numbers, date of last calibration, and accuracy of calibration.
1.9.6
Define procedures specific to each control system including instructions on
how to set control parameters and setpoints, proportional, integral and
derivative mode constants, contact output settings, positioner range
1.9.7
Submit specific to each HVAC control system, including settings adjustments
and results of calibration checks
1.9.7
Space Temperature Control System
In addition to the requirements specified in the paragraph entitled
"SUBMITTALS", meet the following requirements. Submit Operation and
"Product Data." Manual shall contain full hardware support documentation,
which shall include but not be limited to the following:
a.
b.
Installation and initial checkout procedures
c.
Detailed electrical and logical description
d.
Troubleshooting procedures, diagrams, and guidelines
e.
Alignment and calibration procedures for components
f.
Preventive maintenance requirements and a maintenance checklist
g.
h.
Spare parts list data, including required tool kits and suggested
method of repairs such as field repair, factory repair, or item
replacement
i.
Signal identification and timing diagrams
j.
Complete as-built control drawings, schedules, and sequence of
operation
k.
Controller configuration and parameter setting procedures
l.
Step-by-step procedures required for each HVAC control systems
startup, operation, shutdown, recovery, and fault diagnosis
m.
Manufacturer supplied operator manuals for equipment
n.
Qualified service organization list