Centrifugal Type Power Wall Ventilators
Centrifugal Type Power Roof Ventilators
Air-Curtain Fans
Air Handling Units[; G][; G, [_____]]
Room Fan-Coil Units[; G][; G, [_____]]
Constant Volume, Single Duct Terminal Units[; G][; G, [_____]]
Variable Volume, Single Duct Terminal Units[; G][; G, [_____]]
Variable Volume, Single Duct, Fan-Powered Terminal Units[; G][; G,
[_____]]
Dual Duct Terminal Units[; G][; G, [_____]]
Ceiling Induction Terminal Units[; G][; G, [_____]]
Reheat Units[; G][; G, [_____]]
Unit Ventilators
Energy Recovery Devices[; G][; G, [_____]]]
[Test Procedures]
[Proposed test procedures and test schedules for the [ductwork
leak test, and] performance tests of systems, at least 2 weeks
prior to the start of related testing.]
Diagrams[; G][; G, [_____]]
[Proposed diagrams, at least 2 weeks prior to start of related
testing. System diagrams that show the layout of equipment,
piping, and ductwork, and typed condensed operation manuals
explaining preventative maintenance procedures, methods of
checking the system for normal, safe operation, and procedures for
safely starting and stopping the system shall be framed under
glass or laminated plastic. After approval, these items shall be
posted where directed.]
Operation and Maintenance Training
Proposed On-site Training schedule, submitted concurrently with
SD-06 Test Reports
Performance Tests[; G][; G, [_____]]
Test reports for the [ductwork leak test, and] performance tests
in booklet form, upon completion of testing. Document phases of
tests performed including initial test summary,
repairs/adjustments made, and final test results in the reports.
Damper Acceptance Test[; G][; G, [_____]]
Proposed schedule, at least 2 weeks prior to the start of test.
[SD-07 Certificates]
[Bolts]
[Written certification from the bolt manufacturer that the bolts
furnished comply with the requirements of this specification.