Temperature
Parameter
Season
(Degrees C)
of Higher Temperatures
Dry Bulb
Dec.-Feb.
[______]
[______]
Dry Bulb and
June-Sept.
[______]
[______]
Mean Coincident
Wet Bulb
Wet Bulb
June-Sept.
[______]
[______]
Temperature
Parameter
Season
(Degrees F)
of Higher Temperatures
Dry Bulb
Dec.-Feb.
[______]
[______]
Dry Bulb and
June-Sept.
[______]
[______]
Mean Coincident
Wet Bulb
Wet Bulb
June-Sept.
[______]
[______]
**************************************************************************
Contractor shall use site conditions of elevation, design ambient
temperature, and design dry and wet bulb temperature, and duration
(differentiate for different seasons including frequency of occurrence of
higher temperatures) specified.
2.5
OPERATING INSTRUCTIONS
2.5.1
Steam Generators
**************************************************************************
NOTE: Insert appropriate Section number and title
in the blanks below using format per UFC 1-300-02.
**************************************************************************
The system shall be designed for operation with [the boiler(s) specified in
[_____]] [boiler(s) manufactured by [_____], Type [_____], Model No.
[_____]]. The steam generator is [a new] [an existing] [pulverized
coal-fired] [spreader stoker-fired] [underfeed stoker-fired] boiler.
Operating conditions for each steam generator at its maximum rating are:
a.
Type firing [_____]
b.
Steam flow, kg/s lb/hr [_____]
c.
Steam pressure, kPa (gage) psig [_____]
d.
Steam temperature, degrees C degrees F [_____]
e.
Gross heat input, kW 106 Btu/hr [_____]
f.
Excess air leaving boiler, percent [_____]
g.
Grade elevation, meters feet above mean sea level [_____]
SECTION 15864N
Page 29