1.6
EXTRA STOCK
Provide ten percent of total bags and two percent of total cages as spares.
Provide fluorescent powder for one year of normal inspections and provide a
portable ultraviolet light to leak test the bags.
1.7
MODEL
1.7.1
Include:
a.
Name, address, and telephone number of testing organization.
b.
Procedures and equipment to be used.
c.
Model design and construction.
d.
1.7.2
Delivery
Deliver model used during model study, including a support table, [to the
Contracting Officer] within one year of startup of the full size unit.
PART 2
PRODUCTS
2.1
MATERIALS
**************************************************************************
NOTE: This guide specification presents
nonpropriety materials and equipment. When the
guide specification is edited or supplemented to
suit project requirements, exercise care to present
a project specification section which contains no
proprietary materials or equipment.
**************************************************************************
Provide materials suited for the intended service. The material of parts
exposed to the flue gas shall withstand chemical action of flue gas and
flyash.
2.1.1
General
Provide the following materials and minimum thicknesses:
a.
Ductwork (6 mm1/4 inch):
ASTM A 36/A 36M
b.
Hoppers (6 mm1/4 inch):
ASTM A 36/A 36M
c.
Housing (6 mm1/4 inch):
ASTM A 36/A 36M
d.
Structural steel (6 mm1/4 inch):
ASTM A 36/A 36M
e.
Tube sheet (6 mm1/4 inch):
ASTM A 36/A 36M
f.
Weather enclosure (6 mm1/4 inch):
ASTM A 36/A 36M
SECTION 15863N
Page 22