g.
locations, and for providing uniform gas flow; breeching
configuration changes, gas flow vaning, straightening, or gas
distribution devices.
h.
Name and resumes of test personnel.
1.5.9.3
Bag Tests Data
Submit test certification and sample for each finished material lot.
Test
certification data shall include, for each material lot analysis:
a.
Yarn weight.
b.
Permeability.
c.
Tensile strength.
d.
Thickness.
e.
M.I.T. flex.
f.
Count.
g.
Fabric weight.
h.
Bursting strength.
1.5.9.4
Particulate Emissions Tests Report
Submit the particulate emission test report within 45 days of test
completion. Test report shall include:
a.
Process description.
b.
Schematic drawings.
c.
techniques.
d.
Test results including inlet loading, emission rates, and
isokinetic sampling rates.
e.
Raw data for each test run, including calculations, load sheets,
f.
Name and resumes of test personnel.
1.5.9.5
Damper Tests Reports
Submit test reports in accordance with the paragraph entitled "Dampers." In
lieu of poppet damper factory tests include field testing results for
poppet dampers at similar installations.
1.5.9.6
Baghouse Inspection
Submit a written inspection report from the baghouse manufacturer's service
engineers within 15 days after inspection.
SECTION 15863N