Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
CBR Air Filtration System[; G][; G, [_____]]
Installation and Erection[; G][; G, [_____]]
Drawings consisting of equipment layout including assembly and
installation details and electrical connection diagrams; ductwork
layout showing the location of all supports, typical support
details, gauge reinforcement, reinforcement spacing rigidity
classification, and static pressure and seal classifications; and
Drawings shall include table and/or schematic identifying outline
to demonstrate that the system has been coordinated and will
properly function as a unit and shall show equipment relationship
to other parts of the work, including clearances required for
operation and maintenance.
SD-03 Product Data
Standard Products
Statement demonstrating successful completion of similar
services on at least five projects of similar size and scope, at
least 2 weeks prior to submittal of other items required by this
section. Manufacturer's catalog data shall be included for the
following items. The data shall be highlighted to show model,
size, options, etc., that are intended for consideration. Data
shall be adequate to demonstrate compliance with contract
requirements for the following:
a. Filtration System
b. Filtration Elements including Roughing Filter, Pre-filter,,
HEPA Filter, Carbon Adsorber,[Post-Filter], Gasket Seal, Fluid
Seal and Bag-In/Bag-Out Assembly and Banding Kits
c. Isolation Dampers and Damper Operators
SECTION 15860A
Page 6