system, shall be included and approved prior to system startup.
SD-06 Test Reports
Testing
Test reports in booklet form showing all field tests performed
to adjust each component and all field tests performed to prove
compliance with the specified performance criteria, upon
completion and testing of the installed system. Each test report
shall indicate the final position of controls. A written
statement from the manufacturer's representative certifying that
control equipment has been properly installed and is in proper
operating condition, upon completion of the installation. The
action settings for all automatic controls in the form of a typed,
tabulated list indicating the type of control, location, setting,
and function. The test report booklet shall include logs, thermal
efficiency calculations, tabulated results, and conclusions.
SD-10 Operation and Maintenance Data
Operating and Maintenance Instructions[; G][; G, [_____]]
outlining the step-by-step procedures required for system startup,
operation, and emergency shutdown. The instructions shall include
the manufacturer's name, model number, service manual, parts list,
and brief description of all equipment and their basic operating
features. [Six] [_____] complete copies of maintenance
instruction listing routine maintenance procedures, possible
breakdowns and repairs, and troubleshooting guides. The
instructions shall include piping layout, equipment layout, and
simplified wiring and control diagrams for the system as
installed, and other information necessary for equipment
maintenance.
1.3
GENERAL REQUIREMENTS
1.3.1
Standard Products
Material, equipment, and controls shall be the standard products of a
manufacturer regularly engaged in the manufacture of the product and shall
essentially duplicate items that have been in satisfactory use on at least
[three] [_____] jobs for at least 2 years prior to bid opening. To meet
the 2 year experience criteria, the heat recovery boiler must be coupled
with the same type of combustion equipment as stated in the bid package.
Equipment shall be supported by a service organization that is, in the
opinion of the Contracting Officer, reasonably convenient to the plant
site. Controls shall be of a type that has given satisfactory field
performance under normal operating conditions for not less than 2 years or
6000 hours before the award of the contract. Types that have been shown to
have operated satisfactorily for these periods may have modifications,
provided it can be shown that the modifications will not increase
maintenance and operating costs and will not decrease the life of the
equipment.
1.3.2
Nameplates
Each major item of equipment shall have the manufacturer's name, address,