following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Unit heaters
SD-10 Operation and Maintenance Data
Unit heaters, Data Package 2
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
PART 2
PRODUCTS
2.1
UNIT HEATERS
Self-contained and factory assembled, [propeller] [or] [centrifugal] fan
with capacities expressed as Btu per hour output and cubic foot-per-minute
air delivery, operating conditions, and mounting arrangements as indicated.
Average fan bearing life shall be minimum 200,000 hours at operating
conditions. Provide fan motor with [direct] [or] [belt] drive. Construct
fan-guard motor mount of steel wire. Equip each heater with individually
adjustable package discharge louver. Louvers may be substituted by
discharge cones or diffusers. Provide thermostats [as indicated]. Furnish
2.1.1
Gas-Fired Unit Heater
ANSI Z83.8 and AGA label.
2.1.1.1
Casing
Minimum [22] [_____] gage [steel] [or] [aluminum].
Provide removable
access panels.
2.1.1.2
Minimum [20] [_____] gage all-welded steel construction with
corrosion-resistant aluminum finish.
SECTION 15760N
Page 6