3.10
FUEL SYSTEM TESTS
3.10.1
Fuel Oil System Test
STORAGE SYSTEMS.
3.10.2
Gas System Test
The gas fuel system shall be tested in accordance with the test procedures
outlined in NFPA 54.
3.11
FIELD TRAINING
**************************************************************************
NOTE: The number of hours required for giving
instructions for operation and maintenance will
depend on the complexity of the system specified.
The blank will be filled with the appropriate
number. When the system is to be installed at a
location where experienced Government engineers are
on duty, delete the entire paragraph.
**************************************************************************
The Contractor shall conduct a training course for the operating staff as
designated by the Contracting Officer. The training period shall consist
of a total of [_____] hours of normal working time and shall start after
the system is functionally completed but prior to final acceptance tests.
The field instructions shall cover all of the items contained in the
approved operation and maintenance instructions, as well as demonstrations
of routine maintenance operations and boiler safety devices. The
Contracting Officer shall be notified at least 14 days prior to date of
proposed conduction of the training course.
-- End of Section --
SECTION 15569A
Page 77